Dominic Ballesteros Project List
Commercial
Class A Office
Zanjero Falls Corporate Oasis Phase I: 22 Million GMP and II
22 Million GMP 350,000 sf. Class A office- 3 levels built with a structural steel frame sitting on top of a cast in place concrete underground parking garage on a 20 acre site. 4 hydraulic elevators, two large lakes using effluent water, cast in place bridge, pre-cast architectural columns, caps and masonry walls. Wood framed building. II phase incorporated 20 acres of infrastructure, hardscape and asphalt drives with pads prepared for future office villas
Raintree Corporate Center Phase II 40 million GMP and IV 14 Million
40 Million GMP Phase III encompassed a 20 acre site with one 180,000 s.f. Post tension Class A office building and Parking garage. The exterior building materials consist of a combination of three different brick masonry colors with deep green-blue colored 1†insulated, high performance reflective glazing. Window system is anodized aluminum that is accentuated with vertical fins and horizontal bull-nosed metal. Phase Six-level parking structure with four levels below grade, one at grade and one above grade. 18 Million Phase IV included another similar but larger 220,000 sf. Class A office building
High Tech
Bank One Sky Harbor Operation Center Phase I 24 million GMP and II 18 Million :
Health Care
Gila River Indian Community Dialysis Clinics, Sacaton AZ 8 Million and Gila Crossing 5 Million
Project consisted of the shell and first floor build-out of the 400,000 square operations center a central plant and UPS battery backup center. The facility is located on land owned by the City of Phoenix and leased to Bank One. 18 Million Phase II construction consisted of a 297,338 square foot, 3-story precast concrete PG structure.
(2) Dialysis centers located in Sacaton and Gila Crossing, Arizona for the Gila River Indian Community. The east side facility encompasses 24,874 square feet and 40 dialysis treatment stations. The 16,685 square foot center provides treatment from 20 stations. Desert Samaritan Tower 4 expansion, Shea Medical Parking Garage, (2) Dentist, Concentra Medical Office building
Industrial / Correctional
Sky Harbor East Economy Parking Garage
39 Million 215,000 sf pre-cast parking garage, (2) Waste Water Treatment Plants. (3) High to Medium Security correctional facilities
Educational
Chandler Unified School District High School and K-12
RETAIL
Several High Schools with the City of Chandler and Phoenix. Similar projects also included two community churches.
(8) Lowes Home Improvements stores, Pets Mart Distribution Center as well as (6) retail stores, (3) ground up and one Wal-Mart expansion, (1) Sams Club ground up, and (4) ground up Linen and things. Several grey retail projects and power centers as Chandler Festival I and II and the Surprise Town Center.
NukeJobs is a nuclear jobs board that provides nuclear job seekers access to international directories of Nuclear Employers, Nuclear Resumes and Nuclear Jobs such as Nuclear Engineer Jobs, Nuclear Construction Jobs, Nuclear Power Plant Jobs, Nuclear Medicine Jobs, Nuclear Pharmacy Jobs, Nuclear Security Jobs, Nuclear Physics Jobs, Nuclear Reactor Jobs, Nuclear Material Jobs, Nuclear Safety Jobs, and Nuclear Waste Jobs.